average time to install kitchen cabinets

May 23, 2025

Leave a message

Average Time to Install Kitchen Cabinets
The time required to install kitchen cabinets depends on the kitchen size, cabinet type, and whether you're hiring professionals or DIY-ing. Here's a detailed breakdown:


1. Professional Installation

Kitchen Size Timeframe Details
Small (10x10 ft)​ 1–3 days Stock or pre-assembled cabinets; simple layout.
Medium (12x15 ft)​ 3–5 days Semi-custom cabinets, islands, or corner units.
Large/Custom 5–10 days Custom cabinets, complex layouts, or high-end finishes.

2. DIY Installation

Skill Level Timeframe Details
Beginner 5–10 days RTA (ready-to-assemble) cabinets; frequent adjustments.
Experienced 3–7 days Pre-assembled cabinets; basic tools and prior DIY skills.

3. Factors Affecting Installation Time

Cabinet Type:

Stock Cabinets​ (pre-built): Fastest (1–3 days for pros).

RTA Cabinets: Adds 1–2 days for assembly.

Custom Cabinets: Requires precise fitting (up to 10 days).

Prep Work:

Removing old cabinets: ​4–8 hours.

Wall/floor repairs: Adds ​1–2 days.

Layout Complexity:

Islands, angled walls, or soffits: +1–3 days.

Labor Experience:

Pros work 2–3x faster than DIYers.


4. Step-by-Step Timeline (Professional Example)​

Day 1: Remove old cabinets, prep walls/floors.

Day 2: Install base cabinets, secure to wall studs.

Day 3: Install wall cabinets, align doors/drawers.

Day 4: Add trim, crown molding, and hardware.


5. DIY Step-by-Step Timeline

Day 1: Assemble RTA cabinets.

Day 2: Remove old cabinets, prep walls.

Day 3–4: Install base cabinets.

Day 5–6: Install wall cabinets.

Day 7: Adjust doors, add hardware.


6. Common Delays

Uneven walls/floors: Requires shimming (+4–8 hours).

Missing parts: Common with RTA cabinets (+1–2 days).

Plumbing/electrical adjustments: Adds 1–3 days.


7. Tips to Save Time

Pre-assemble RTA cabinets before installation day.

Rent tools (e.g., laser level, cabinet jack) to speed up alignment.

Hire a helper for lifting/positioning wall cabinets.


Final Note: For most homeowners, hiring a pro ensures a ​2–5 day​ turnaround. DIYers should budget ​1–2 weekends​ and expect a learning curve. Always measure twice and plan for unexpected delays!

\boxed{
Key Takeaway: For a ​standard 10x10 kitchen, pros typically finish in ​2–3 days, while DIYers need ​5–7 days. Custom or complex layouts can double the time.
}