how long does it take to replace kitchen cabinet
May 18, 2025
Leave a message
Replacing kitchen cabinets typically takes 2–6 weeks, depending on whether you're doing it yourself (DIY), hiring professionals, or dealing with custom cabinets. Here's a breakdown of timelines and factors:
Key Factors Impacting Timeline
Cabinet Type:
Stock Cabinets: 1–3 weeks (readily available at stores like IKEA or Home Depot).
Semi-Custom: 4–8 weeks (adjustments to pre-made designs).
Custom Cabinets: 8–16 weeks (built to order).
Scope of Work:
Full kitchen vs. partial replacement.
Structural changes (e.g., moving plumbing, electrical, or walls).
Labor:
DIY: 1–3 weeks (prep, installation, finishing).
Professional Installers: 3–7 days (after cabinets arrive).
Step-by-Step Timeline
Stage | Duration |
---|---|
Planning/Design | 1–4 weeks (measurements, ordering, permits if needed). |
Cabinet Delivery | 1–16 weeks (stock vs. custom). |
Demo/Old Cabinet Removal | 1–2 days (including disposal). |
Installation | 2–5 days (professionals) or 1–2 weeks (DIY). |
Countertops | Add 1–3 weeks (template, fabrication, installation). |
Finishing Touches | 1–2 days (hardware, trim, touch-ups). |
Common Delays
Backordered Cabinets: Especially common with semi-custom or custom orders.
Countertop Fabrication: Requires precise templating after cabinets are installed.
Structural Surprises: Rot, mold, or uneven walls discovered during demo.
Appliance Lead Times: Delays if new appliances don't fit existing cabinet cutouts.
Tips to Save Time
Order Cabinets Early: Especially for custom designs.
Prep the Space: Clear the kitchen and protect floors/walls before work begins.
Hire a Pro for Plumbing/Electrical: Avoid DIY mistakes that cause delays.
Choose Pre-Assembled Cabinets: Faster than flat-pack (RTA) for DIYers.
DIY vs. Professional
Scenario | Total Time |
---|---|
DIY with Stock Cabinets | 2–3 weeks (including prep and finishing). |
Pro Install (Stock) | 1–2 weeks (demo to completion). |
Custom Cabinets + Pro | 8–16 weeks (design to install). |
Final Thought: For a quick refresh, stock cabinets with professional installation take ~2 weeks. For a full custom kitchen, plan for 2–4 months. Always factor in buffer time for unexpected delays! ⏳🔨